Homeowners€1,800
maximum, for systems of 4 kWp and above
SEAI Solar Electricity Grant
The scheme most people mean. Paid to you after installation, and we do the application.
- Rate
- €700/kWp first 2 kWp, then €200/kWp
- Maximum
- €1,800 at 4 kWp and above
- Eligibility
- Home built and occupied before 2021
Administered by SEAI
Home solar →BusinessesUp to €162,600
for systems up to 1,000 kWp
SEAI Non-Domestic Microgen Scheme
A separate scheme entirely. Open to commercial, public sector and community applicants, and it covers labour as well as equipment.
- Rate
- Tiered from €900/kWp, reducing on larger systems
- Maximum
- €162,600, systems up to 1,000 kWp
- Covers
- Panels, inverter, mounting and installation
Administered by SEAI
Commercial solar →Farmers60%
grant aid, up to €54,000
TAMS 3 Solar Capital Investment Scheme
Not SEAI at all. Farm solar goes through the Department of Agriculture under TAMS, at a better rate.
- Grant rate
- 60% of eligible costs
- Ceiling
- €90,000, ring-fenced from other TAMS quotas
- Maximum
- Up to €54,000
Administered by Department of Agriculture, Food and the Marine
Talk to us →Homeowners€12,500
maximum for a house, €9,500 for an apartment
SEAI Heat Pump System Grant
Increased from €6,500 to €12,500 on 3 February 2026. Not one payment but three: the heat pump itself, a central heating upgrade, and a bonus for leaving a fossil fuel behind. The upgrade component names underfloor heating explicitly, so a heat pump and underfloor job draws on both.
- Air to water, ground source, exhaust air, water to water
- €12,500 for a house, €9,500 for an apartment
- Air to air
- €7,500. Does not provide hot water
- Heat pump unit
- Up to €6,500 of the total
- Central heating upgrade
- Up to €2,000 for new radiators or underfloor heating, where required
- Renewable Heat Bonus
- €4,000 when replacing an oil or gas boiler, solid fuel, or electric storage heating
- Technical assessment
- €200. Required for homes built before 2007, and must be done before applying
- Eligibility
- Home must have an MPRN and have been built and occupied before 2021